All cases
Manufacturing
North Industrial Zone
2024
North Zone plant
A working plant that could not stop for maintenance. We moved servicing online and visits to a schedule.

83%
of faults fixed remotely
99.8%
recording uptime
6 h
between self-checks
The task
The plant runs three shifts. Any engineer visit meant permits, escorts and downtime, so small faults waited weeks.
What we built
A maintenance plan built around remote health checks. The system tests every camera, disk and power supply every six hours and opens a ticket before the fault becomes visible.
The result
Most issues are solved without anyone on site. The rest are fixed during planned visits, and recording has stayed above 99.8 percent for a year.
Engineers stopped walking our plant with laptops. Faults are fixed before our shift lead hears about them.
Plant manager, North Zone


Planning something similar?
Tell us about the site. An engineer visits for free, and you get a coverage plan with a fixed price.
Get a quote


